電氣化鐵道實習(xí)報告

電氣化鐵道實習(xí)報告

ID:12292680

大?。?7.50 KB

頁數(shù):33頁

時間:2018-07-16

電氣化鐵道實習(xí)報告_第1頁
電氣化鐵道實習(xí)報告_第2頁
電氣化鐵道實習(xí)報告_第3頁
電氣化鐵道實習(xí)報告_第4頁
電氣化鐵道實習(xí)報告_第5頁
資源描述:

《電氣化鐵道實習(xí)報告》由會員上傳分享,免費在線閱讀,更多相關(guān)內(nèi)容在教育資源-天天文庫。

1、電氣化鐵道實習(xí)報告電氣化鐵道實習(xí)報告deformationsmall;DangengineeringpilealsoperfusionpileShi,cansynchronizationconstruction,constructionconducivedurationshort;pilebetweengapeasycausedsoilerosion,specialShihighlevelsoftclayqualityarea,neededaccordingengineeringconditionstaken

2、otepulp,cementmixingpile,spinspraypile,constructionmeasuressolutionblockwaterproblem;Suitablesoftclayeysandyareas,constructionshouldpebbles;betweenpilepilethroughpiletopbeamwallpurlinsthusrelativelypooroverall,importantareas,specialprojectslargeFoundationpi

3、texcavationdepthapplicationrequiresspecialcare.2.1.6steelpilesusingsteelpilessupportingFoundationpittemporarysupportfeatures,constructionconvenient,short,finishedconstructionFoundationpitbackfillafterchannelpulledout,re-use,canminimizesupport.Usedsteelpiles

4、supportingfatalweakness,smallsoilparticles,alsocalledhighwaterprecipitationundergroundwaterlevelhigh,water-richgeologicalconditionsdidmatch.Flexural33電氣化鐵道實習(xí)報告電氣化鐵道實習(xí)報告deformationsmall;DangengineeringpilealsoperfusionpileShi,cansynchronizationconstruction,c

5、onstructionconducivedurationshort;pilebetweengapeasycausedsoilerosion,specialShihighlevelsoftclayqualityarea,neededaccordingengineeringconditionstakenotepulp,cementmixingpile,spinspraypile,constructionmeasuressolutionblockwaterproblem;Suitablesoftclayeysand

6、yareas,constructionshouldpebbles;betweenpilepilethroughpiletopbeamwallpurlinsthusrelativelypooroverall,importantareas,specialprojectslargeFoundationpitexcavationdepthapplicationrequiresspecialcare.2.1.6steelpilesusingsteelpilessupportingFoundationpittempora

7、rysupportfeatures,constructionconvenient,short,finishedconstructionFoundationpitbackfillafterchannelpulledout,re-use,canminimizesupport.Usedsteelpilessupportingfatalweakness,smallsoilparticles,alsocalledhighwaterprecipitationundergroundwaterlevelhigh,water-

8、richgeologicalconditionsdidmatch.Flexural33電氣化鐵道實習(xí)報告電氣化鐵道實習(xí)報告deformationsmall;DangengineeringpilealsoperfusionpileShi,cansynchronizationconstruction,constructionconducivedurationshort;pilebetweengapeas

當前文檔最多預(yù)覽五頁,下載文檔查看全文

此文檔下載收益歸作者所有

當前文檔最多預(yù)覽五頁,下載文檔查看全文
溫馨提示:
1. 部分包含數(shù)學(xué)公式或PPT動畫的文件,查看預(yù)覽時可能會顯示錯亂或異常,文件下載后無此問題,請放心下載。
2. 本文檔由用戶上傳,版權(quán)歸屬用戶,天天文庫負責整理代發(fā)布。如果您對本文檔版權(quán)有爭議請及時聯(lián)系客服。
3. 下載前請仔細閱讀文檔內(nèi)容,確認文檔內(nèi)容符合您的需求后進行下載,若出現(xiàn)內(nèi)容與標題不符可向本站投訴處理。
4. 下載文檔時可能由于網(wǎng)絡(luò)波動等原因無法下載或下載錯誤,付費完成后未能成功下載的用戶請聯(lián)系客服處理。