1、維普資訊http://www.cqvip.com第20096期年(總129月9)鐵道工程學(xué)報(bào)Dec20o6JOURNALOFRAILWAYENGINEERINGS0CIETYNO.9(Ser.99)文章編號:1006—2106(2006)09—0031—05非對稱連續(xù)梁橋設(shè)計(jì)與施工’陳建峰¨李慧君袁明游勵暉(鐵道第二勘察設(shè)計(jì)院,成都610031)摘要:研究目的:針對橋位地形要求,研究不對稱連續(xù)梁的設(shè)計(jì)特點(diǎn)和截面尺寸選擇的方法,研究不對稱連續(xù)梁合理的施工方法以保證梁體施工安全。研究方法:采用有限元程序?qū)Σ粚ΨQ連續(xù)梁進(jìn)行施工階段、運(yùn)營階段受力分析,選
2、定梁體截面尺寸及梁體懸臂灌注施工順序。研究結(jié)果:通過調(diào)整不對稱連續(xù)梁邊中跨梁高、截面尺寸,解決了不對稱連續(xù)梁內(nèi)力平衡,采用合理施工方法確保了不對稱連續(xù)梁施工安全,并且滿足了梁體線形要求。研究結(jié)論:根據(jù)橋位處要求及分析結(jié)果,大圓里雙線特大橋主橋采用52Ill+112Ill+64Ill不對稱連續(xù)梁,最小邊跨與主跨比僅為0.464,梁體曲線采用2種拋物線及不同梁高尺寸解決節(jié)段不平衡的問題,再以合理的梁體施工方法來保證施工安全。關(guān)鍵詞:大圓里;結(jié)構(gòu)不對稱;浙贛鐵路;預(yù)應(yīng)力混凝土連續(xù)梁中圖分類號:U442.5;U448.215文獻(xiàn)標(biāo)識碼:ADesignan
3、dConstructionofAsymmetricContinuousBeamBridgeCHENJian—fleng,LIHui—jim,YUANMing,YOULi—hui‘(TheSecondSurveyandDesignInstituteofChinaRailway,Chengdu,Siehuan610031,China)Abstract:Researchpurposes:Thepurposesofthispaperaretostudythedesignfeatures,themethodofdesigningthesectiondime
4、nsionandthereasonableconstructiontechniqueforasymmetriccontinuousbeamtoguaranteethesafetyofconstructionofbeamaccordingtotherequirementsoftopographyofthebridgesite。Researchmethods:Byusing3D—FEMsoftware,theanalysisismadeforpressureconditionsofasymmetriccontinuousbeamduringconst
5、ructionstageandservicestage,thesectiondimensionofbeamandtheconstructionsequenceforcantilevercastinginplacearedesigned.Researchresults:TheproblemofbalanceofinternalforcewithinbeamCanbesolvedbyadjustingthebeamheightandsectionsizesofsidespanandmainspanoftheasymmetriccontinuousbe
6、am,andthesafetyofconstructionofasymmetriccontinuousbeamcanbeguaranteedandtherequirementoflinerforbeamCanbemetbyadoptingreasonableconstructionmethod.Researchconclusions:Basedontherequirementsofbridgesiteandtheanalysisresultofthebridge,anasymmetriccontinuousbeamwiththemainspans
7、arrangedas(52+112+64)masymmetricspansisadoptedtothemainbridgeofDayuanlidoublelineextra—longbridge。TheratioofminimumsidespantomainspanWasonly0.464,andtheproblemofsegmentunbalanceCanbesolvedbyadoptingtwoparabolaforbeamcurveandtwodiferentheightsofbeam。Inaddition,app~eationofreas
8、onableconstructionmethodsCanguaranteetheconstructionsafety.Keywords: