1、資料內(nèi)容僅供您學(xué)習(xí)參考,如有不當(dāng)或者侵權(quán),請聯(lián)系改正或者刪除。目錄第一章.編制說明······················251.1工程名稱······················251.2編制目的、宗旨··················251.3編制依據(jù)······················251.4適用范圍······················261.5本工程采用規(guī)范標(biāo)準(zhǔn)·················26第二章.工程概況······················282.1概況··········
2、··············282.2工程建設(shè)現(xiàn)場條件··················292.3質(zhì)量、工期要求··················29第三章.施工部署······················303.1總體指導(dǎo)思想····················303.2施工部署原則····················303.3施工部署······················30第四章.組織管理······················324.1項目組織機(jī)構(gòu)····················32資
3、料內(nèi)容僅供您學(xué)習(xí)參考,如有不當(dāng)或者侵權(quán),請聯(lián)系改正或者刪除。4.2與業(yè)主的配合····················374.3與監(jiān)理的配合····················384.4與設(shè)計人的配合···················39第五章.施工準(zhǔn)備······················405.1技術(shù)準(zhǔn)備······················405.2物資準(zhǔn)備······················405.3勞動力準(zhǔn)備·····················415.4施工現(xiàn)場準(zhǔn)備·········
4、···········42第六章.施工計劃······················446.1施工總體進(jìn)度計劃446.2勞動力計劃·····················456.3施工設(shè)備需用計劃··················46第七章.施工總平面圖布置··················477.1布置原則······················477.2施工用電······················477.3施工用水······················477.4施工道路及排水···········
5、········47資料內(nèi)容僅供您學(xué)習(xí)參考,如有不當(dāng)或者侵權(quán),請聯(lián)系改正或者刪除。7.5施工大臨設(shè)施····················47第八章.主要施工方法····················498.1沉井施工工藝····················498.2土建工程分部分項施工方法···············錯誤!未定義書簽。8.4工藝管道安裝····················628.5儀表安裝調(diào)試····················66第九章.項目管理目標(biāo)····················
6、739.1工程項目管理目標(biāo)··················739.2質(zhì)量保證體系及保證措施···············749.3工期保證措施····················979.4施工安全保證措施·····························1009.5消防保衛(wèi)措施·····························109資料內(nèi)容僅供您學(xué)習(xí)參考,如有不當(dāng)或者侵權(quán),請聯(lián)系改正或者刪除。9.6文明施工保證措施·····························1109.7環(huán)境及衛(wèi)生保證措施·
7、····························1139.8成品保護(hù)措施·····························1149.9技術(shù)保證措施·····························115資料內(nèi)容僅供您學(xué)習(xí)參考,如有不當(dāng)或者侵權(quán),請聯(lián)系改正或者刪除。第一章.編制說明1.1工程名稱文水海威鋼鐵有限公司新區(qū)300萬t/a鋼鐵項目—旋流井工程1.2編制目的、宗旨本施工組織設(shè)計是為文水海威鋼鐵有限公司新區(qū)300萬t/a鋼鐵項目—旋流井工程施工需要編制的。編制的指導(dǎo)思想是:編制時為業(yè)主著想,施工時對
8、業(yè)主負(fù)責(zé),竣工時讓業(yè)主滿意,同時在經(jīng)濟(jì)上合理,技術(shù)上可靠的前提下,保質(zhì)、保量、保工期。1.3編制依據(jù)本施工組織設(shè)計編制依據(jù)是投標(biāo)文件;;國家現(xiàn)行規(guī)范、規(guī)程、標(biāo)準(zhǔn);ISO9001:、ISO14001:1996、OHSAS18001:1999整合型管理體系標(biāo)準(zhǔn)。并結(jié)合以往施工同類