資源描述:
《溫州市xxx建設(shè)工程打樁施工方案》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在學(xué)術(shù)論文-天天文庫(kù)。
1、溫州市*******建設(shè)工程打樁施工方案******有限公司目錄1概況·1.1工程概況············································11.2場(chǎng)地工程地質(zhì)及水文地質(zhì)條件···························11.2.1場(chǎng)地工程地質(zhì)條件··································11.2.2水文地質(zhì)條件········································41.3設(shè)計(jì)說(shuō)明及施工要求······················
2、·············51.3.1設(shè)計(jì)及施工要求··································51.3.2樁表·································61.4施工組織設(shè)計(jì)編寫(xiě)依據(jù)·································82工程施工的方法、準(zhǔn)備·2.1施工方法············································82.1.1施工機(jī)械設(shè)備選型、配備····························82.1.2施工作
3、業(yè)順序及機(jī)械布置·····························92.1.3施工工藝··········································102.2施工準(zhǔn)備2.2.1清理平整場(chǎng)地······································102.2.2接通施工用電、水源································102.2.3搭建臨時(shí)設(shè)施······································112.2.4建立抽排水溝、泥漿池、集水
4、坑及外排清水系統(tǒng)········112.2.5技術(shù)交底··········································112.2.6簽訂原材料供應(yīng)合同································123分部分項(xiàng)工程施工方案·3.1樁位測(cè)放及護(hù)筒埋設(shè)···································123.1.1樁位測(cè)放···········································123.1.2護(hù)筒埋設(shè)·······················
5、···················123.2鉆孔3.2.1鉆機(jī)就位··········································133.2.2鉆孔垂直度·········································143.2.3鉆孔直徑··········································143.2.4鉆孔護(hù)壁···········································153.2.5鉆孔深度··················
6、························153.2.6清孔換漿(第一次清孔)·····························163.3鋼筋籠制作、安裝····································163.4安裝導(dǎo)管············································183.5二次清孔·············································193.6混凝土配合比及砼灌注························
7、·········193.6.1混凝土灌注········································193.6.2混凝土試塊制作與養(yǎng)護(hù)······························203.6.3護(hù)筒拔出、回填空孔································213.7成樁施工過(guò)程中的應(yīng)急措施·····························213.8成本降低措施·········································223.9泥漿外運(yùn)···
8、·········································224施工機(jī)械進(jìn)場(chǎng)、退場(chǎng)計(jì)劃及工程材料進(jìn)場(chǎng)計(jì)劃·4.1施工機(jī)械進(jìn)場(chǎng)、退場(chǎng)計(jì)劃······························234.2工程材料進(jìn)場(chǎng)計(jì)劃················