環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)

環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)

ID:11786236

大小:34.50 KB

頁(yè)數(shù):11頁(yè)

時(shí)間:2018-07-14

環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第1頁(yè)
環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第2頁(yè)
環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第3頁(yè)
環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第4頁(yè)
環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第5頁(yè)
資源描述:

《環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在教育資源-天天文庫(kù)

1、環(huán)氧樹(shù)脂干式電力變壓器安裝技術(shù)要求(Technicalrequirementsforinstallationofepoxydrytypepowertransformers)Technicalrequirementsforinstallationofepoxydrytypepowertransformers(1)preliminarypreparation;1)transformerinstallationdrawings,completeprocedures,andthroughthepowersect

2、orapprovalinformation.2)weshouldunderstandthedesignofthetransformerperformance,structuralcharacteristicsandrelatedtechnicalparameters.(2)equipmentandmaterialrequirements;1)transformerspecifications,models,capacityshouldcomplywiththedesignrequirements,and

3、itsaccessories,sparepartscomplete,andshouldhaveequipmentrelatedtechnicaldocuments,andproductfactorycertificate.Theequipmentshallbeequippedwithanameplate.Thenameplateshallindicatethemanufacturer'sname,ratedcapacity,oneortworatedvoltage,current,impedance,a

4、ndwiringgroup.2)auxiliarymaterial:weldingrod,antirustpaint,blendingpaintshouldcomplywiththedesignrequirements,andhaveproductqualificationcertificate.(3)workingconditions;1)transformer,indoorwalls,roofandfloorengineeringshouldbecompleted,theroofwaterproof

5、leakage,doorsandwindowsandglassinstallationintact,floorfinishingworkisover,theoutdoorfieldlevelingequipmentonthebasisofpreparationofmapconstructioniscompleted.Aftertheelectricitycannotredecorationworks,aswellastheoperationofsafetyprojects,constructioncom

6、pleted.2)reservedholeshavebeenembeddedparts,cleanupandadjustedtomeetthedesignrequirements.3)protectivenetworkdoors,railingsandothersafetyfacilities,ventilation,fireinstallation,installation.4)theconstructionqualityofbuildingsandstructuresrelatedtotheinst

7、allationofpowertransformersshallbeinconformitywiththeprovisionsofthecurrentbuildingconstructionandacceptancespecifications.Whentheequipmentanddesignhavespecialrequirements,itshouldcomplywithotherrequirements.(4)checkingoutofthebox1)thetransformerunpackin

8、gexaminationpersonnelshallbecomposedofconstructionunits,supervisionunits,constructionandinstallationunitsandsuppliers,andshalljointlychecktheequipmentoutoftheboxandmakearecordofit.2)checkoutoftheboxshouldbebasedontheconstr

當(dāng)前文檔最多預(yù)覽五頁(yè),下載文檔查看全文

此文檔下載收益歸作者所有

當(dāng)前文檔最多預(yù)覽五頁(yè),下載文檔查看全文
溫馨提示:
1. 部分包含數(shù)學(xué)公式或PPT動(dòng)畫(huà)的文件,查看預(yù)覽時(shí)可能會(huì)顯示錯(cuò)亂或異常,文件下載后無(wú)此問(wèn)題,請(qǐng)放心下載。
2. 本文檔由用戶上傳,版權(quán)歸屬用戶,天天文庫(kù)負(fù)責(zé)整理代發(fā)布。如果您對(duì)本文檔版權(quán)有爭(zhēng)議請(qǐng)及時(shí)聯(lián)系客服。
3. 下載前請(qǐng)仔細(xì)閱讀文檔內(nèi)容,確認(rèn)文檔內(nèi)容符合您的需求后進(jìn)行下載,若出現(xiàn)內(nèi)容與標(biāo)題不符可向本站投訴處理。
4. 下載文檔時(shí)可能由于網(wǎng)絡(luò)波動(dòng)等原因無(wú)法下載或下載錯(cuò)誤,付費(fèi)完成后未能成功下載的用戶請(qǐng)聯(lián)系客服處理。