環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)

環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)

ID:11786236

大?。?4.50 KB

頁數(shù):11頁

時間:2018-07-14

環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第1頁
環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第2頁
環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第3頁
環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第4頁
環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)_第5頁
資源描述:

《環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(technical requirements for installation of epoxy dry type power transformers)》由會員上傳分享,免費在線閱讀,更多相關(guān)內(nèi)容在教育資源-天天文庫。

1、環(huán)氧樹脂干式電力變壓器安裝技術(shù)要求(Technicalrequirementsforinstallationofepoxydrytypepowertransformers)Technicalrequirementsforinstallationofepoxydrytypepowertransformers(1)preliminarypreparation;1)transformerinstallationdrawings,completeprocedures,andthroughthepowersect

2、orapprovalinformation.2)weshouldunderstandthedesignofthetransformerperformance,structuralcharacteristicsandrelatedtechnicalparameters.(2)equipmentandmaterialrequirements;1)transformerspecifications,models,capacityshouldcomplywiththedesignrequirements,and

3、itsaccessories,sparepartscomplete,andshouldhaveequipmentrelatedtechnicaldocuments,andproductfactorycertificate.Theequipmentshallbeequippedwithanameplate.Thenameplateshallindicatethemanufacturer'sname,ratedcapacity,oneortworatedvoltage,current,impedance,a

4、ndwiringgroup.2)auxiliarymaterial:weldingrod,antirustpaint,blendingpaintshouldcomplywiththedesignrequirements,andhaveproductqualificationcertificate.(3)workingconditions;1)transformer,indoorwalls,roofandfloorengineeringshouldbecompleted,theroofwaterproof

5、leakage,doorsandwindowsandglassinstallationintact,floorfinishingworkisover,theoutdoorfieldlevelingequipmentonthebasisofpreparationofmapconstructioniscompleted.Aftertheelectricitycannotredecorationworks,aswellastheoperationofsafetyprojects,constructioncom

6、pleted.2)reservedholeshavebeenembeddedparts,cleanupandadjustedtomeetthedesignrequirements.3)protectivenetworkdoors,railingsandothersafetyfacilities,ventilation,fireinstallation,installation.4)theconstructionqualityofbuildingsandstructuresrelatedtotheinst

7、allationofpowertransformersshallbeinconformitywiththeprovisionsofthecurrentbuildingconstructionandacceptancespecifications.Whentheequipmentanddesignhavespecialrequirements,itshouldcomplywithotherrequirements.(4)checkingoutofthebox1)thetransformerunpackin

8、gexaminationpersonnelshallbecomposedofconstructionunits,supervisionunits,constructionandinstallationunitsandsuppliers,andshalljointlychecktheequipmentoutoftheboxandmakearecordofit.2)checkoutoftheboxshouldbebasedontheconstr

當前文檔最多預覽五頁,下載文檔查看全文

此文檔下載收益歸作者所有

當前文檔最多預覽五頁,下載文檔查看全文
溫馨提示:
1. 部分包含數(shù)學公式或PPT動畫的文件,查看預覽時可能會顯示錯亂或異常,文件下載后無此問題,請放心下載。
2. 本文檔由用戶上傳,版權(quán)歸屬用戶,天天文庫負責整理代發(fā)布。如果您對本文檔版權(quán)有爭議請及時聯(lián)系客服。
3. 下載前請仔細閱讀文檔內(nèi)容,確認文檔內(nèi)容符合您的需求后進行下載,若出現(xiàn)內(nèi)容與標題不符可向本站投訴處理。
4. 下載文檔時可能由于網(wǎng)絡(luò)波動等原因無法下載或下載錯誤,付費完成后未能成功下載的用戶請聯(lián)系客服處理。