1、橋梁建設(shè)2012年第42卷第5期(總第215期)BridgeConstruction,Vo1.42,No.5,2012(TotallyNo.215)95文章編號(hào):1003—4722(2012)05—0095—08大跨度連續(xù)鋼桁梁柔性拱橋帶拱頂推施工(1.中鐵四局集團(tuán)鋼結(jié)構(gòu)有方限公繼司,,安夏徽合陽(yáng)肥,張慶發(fā),王靜峰230031;2.合肥工業(yè)大學(xué),安徽合肥230009)摘要:南淝河特大鐵路橋?yàn)殇撹炝喝嵝怨敖Y(jié)構(gòu),采用了鋼桁梁帶拱頂推施工,對(duì)帶拱頂推的施工設(shè)備、主要施工工況及施工關(guān)鍵技術(shù)進(jìn)行分析。為實(shí)現(xiàn)鋼桁梁帶拱頂推,施工時(shí)主要布置了拼裝支架、輔助墩、導(dǎo)梁等輔助鋼結(jié)構(gòu)系統(tǒng),并采用多點(diǎn)
2、同步頂推和機(jī)電液一體化原理施工。鋼桁梁帶拱頂推施工主要包括4個(gè)工況:鋼桁梁多點(diǎn)頂推至最大懸臂,柔性拱體系未形成、鋼桁梁帶拱頂推,柔性拱拱腳合龍,鋼桁梁帶拱頂推就位。利用MIDASCivil軟件建模分析,根據(jù)分析結(jié)果采取措施實(shí)現(xiàn)了帶拱頂推、導(dǎo)梁上墩、無(wú)應(yīng)力合龍等關(guān)鍵施工技術(shù);同時(shí)采取施工監(jiān)控技術(shù),確保成橋后橋梁的內(nèi)力、應(yīng)力及線形與設(shè)計(jì)相符。關(guān)鍵詞:鐵路橋;拱橋;鋼桁梁;頂推法架橋;橋梁施工中圖分類號(hào):U448.22;U445.46文獻(xiàn)標(biāo)志碼:AIncrementalLaunchingConstructionofaLongSpanBridgewithContinuousSteelT
3、russGirderandFlexibleArchFANGJi,XIAYang,ZHANGQing—fa。WANGJing—feng。(1.SteelStructureCo.,Ltd.,ChinaRailwaySijuCivilEngineeringGroup,Herei230031,China;2.HefeiUniversityofTechnology,Hefei230009,China)Abstract:TheSouthFeiheRiverRailwayBridgeisalongspanstructurewithcontinuoussteeltrussgirderandfl
4、exiblearchconstructedbytheincrementallaunchingofthetrussgirderwiththearch.Forthelaunchingofthegirderwiththearch,theconstructionequipment,princi—palconstructionloadcasesandtherelatedkeyconstructiontechniqueswereanalyzed.Torealizethesmoothlaunching,theauxiliarysteelstructuralsystemsoftheassemb
5、lingscaffoldings。auxil—iarypiersandlaunchingnosewerearrangedintheconstructionandthelaunchingwascarriedout,usingthemulti~pointconcurrentlaunchingandtheintegratedmachinery,electricalpowerandhy—draulicprinciple。Thelaunchingofthegirderwiththearchmainlyincludedfourloadcasesofthemulti—pointlaunchi
6、ngofthegirdertoitslongestcantilever;thelaunchingofthegirderwiththearchbeforeformationofthecompleteflexiblearchsystem;theclosureofthefiexiblearchspringandthefinallaunchingofthegirderwiththearchinplace.ThesoftwareMIDASCivilwasusedtoestablishthemodelandtoconducttheanalysisofthelaunchingandaccor
7、dingtotheresuItsoftheanalysis,thenecessarymeasuresweretakentorealizethekeyconstructiontechniquesforthelaunching,reachingofthelaunchingnosetothefrontpiersandunstressedclosureofthearchspring.Atthesametime,theconstructionmonitoringandcontro1techniques