《山區(qū)大跨度懸索橋鋼桁梁施工技術(shù)》由會(huì)員上傳分享,免費(fèi)在線閱讀,更多相關(guān)內(nèi)容在行業(yè)資料-天天文庫。
1、橋梁建設(shè)2012年第卷第3期(總第213期)BridgeConstruction,Vo1.42,No.3,2012(TotallyNo.213)107文章編號(hào):1003—4722(2012)03—0107—07山區(qū)大跨度懸索橋鋼桁梁施工技術(shù)紀(jì)為詳,陶路?!?1.貴州高速公路開發(fā)總公司,貴州貴陽550001;2.中鐵大橋局集團(tuán)橋科院有限公司湖北武漢430034;3.橋梁結(jié)構(gòu)安全與健康湖北省重點(diǎn)實(shí)驗(yàn)室,湖北武漢430034)摘要:為解決山區(qū)大跨度懸索橋鋼桁梁架設(shè)施工受地形條件限制的問題,以壩陵河大橋?yàn)楸尘埃芯繕蛎娴鯔C(jī)懸
2、臂架設(shè)法施工中不同區(qū)域的鋼桁梁安裝、鋼桁梁合龍及鋼桁梁提升等施工技術(shù)。首、次節(jié)梁段采用整體吊裝施工,標(biāo)準(zhǔn)梁段及臨時(shí)鉸處梁段采用桁片吊裝架設(shè),并在臨時(shí)鉸處設(shè)置支撐系統(tǒng)(與鋼桁梁鉸接);臨時(shí)鉸采用自然合龍,跨中鋼桁梁合龍前調(diào)整豎向高差及上、下弦合龍口縱向相對(duì)偏差(暫不安裝合龍口前端永久吊索),合龍時(shí)在橋塔處牽引鋼桁梁調(diào)整縱向偏差;單點(diǎn)提升力大于2400kN的梁段采用兩點(diǎn)提升,其余梁段均采用單點(diǎn)提升。關(guān)鍵詞:懸索橋;鋼桁梁;橋面吊機(jī);懸臂拼裝架橋;施工技術(shù);橋梁施工中圖分類號(hào):U448.25;U445.4文獻(xiàn)標(biāo)志碼:ACo
3、nstructionTechniquesforSteelTrussGirderofLongSpanSuspensionBridgeinMountainousRegionjIWei—xiang.TAOLu'。(1.GuizhouExpresswayDevelopmentCorporation,Guiyang550001,China;2.BridgeScienceResearchInstituteLtd.,ChinaRailwayMajorBridgeEngineeringGroup,Wuhan430034,China;
4、3.KeyLaboratoryofBridgeStructureSafetyandHealthofHubeiProvince,Wuhan430034,China)Abstract:Tocopewiththeproblemthattheerectionofthesteeltrussgirderoflongspansuspensionbridgeinmountainousregionisrestrictedbythetopographicconditionsintheregion,theBalingRiverBridge
5、istakenasanexample,theconstructibntechniquesfortheerection,clo—sureandliftingofdifferentareasofthetrussgirder,usingthedeckcranecantilevererectionmethodarestudied.Accordingtothestudy,thefirstandsecondaryblocksofthegirdershouldbeintegrallyliftedandassembled,thety
6、picalblocksandtheblockatthetemporaryhingeshouldbeliftedandassembledineachtrussunitandthesupportsystem(hingedlyconnectedwiththegirder)shouldbeaccordinglyarrangedatthetemporaryhinge.Thetemporaryhingeshouldbeclosedinanaturalwayandbeforetheclosureofthemidspansteelt
7、russgirder。theverticalheightdifferencesandthelongitudinalrelativedeviationdifferencesatthegapsoftheupperandlowerchordsofthegirder(thefrontendpermanentsuspendersaretemporarilynotassembled)shouldbeadjusted.Atthetimeoftheclosure,thegirderistobehauledatthetowertoad
8、justthelongi—tudinaldeviationdifferences.Fortheblockswiththesingle—pointliftingforcegreaterthan2400kN,thetwo—pointliftingshouldbeappliedwhilefortherestoftheblocks,thesingle—